Client : A V Hessel Ltd
Cost : £23,125,000
Sector : Industrial/Manufacturing,Office/Commercial
Location : Pocklington
Duration : 18 weeks

Extension to existing unit.

The scope of works included the design and construction of two workshop units of approximate size 30.5m x 24m with a structural steel frame on a concrete pad and strip foundations.
 
The ground bearing floor slab will be constructed to support a 2.4m x 1.2m grid racking system up to 5.00m in height.
 
Other works included electrical installations to the workshop units, service connections for electrics, water and telephones, as well as external works for both surface and foul water drainage and Tarmacadam surfaces for car parking and vehicle manoeuvring areas.
 


Additional images (click to view full size)


Latest Projects


Following the completion of re-roofing 74 housese in 2008.


Further works at the Univeristy of Hull.


The extension and refurbishment of a 1970’s infant school and the demolition of an existing junior s...


The reconstruction of the market hall to provide a flexible auditorium space, seating for 150-20.


The project involved the removal of the front façade of the building, the strip out of internal fitt...


The scheme consists of the construction of 12 bespoke industrial units contained within 3 structural...


Further works at Rainham Steel.


Houlton were appointed as Contractor Partner to this major Campus Redevelopment Framework in June 20...


This 16 acre site is situated along the banks of the river Hull. The site has had various uses over ...